This guideline has been prepared as an instrument to assist the proponent to remove armour rocks from the project site in an environmentally sustainable manner. This document was submitted as an identification of the work methodologies and environmental mitigation measures proponent will practice. This guideline provides details of the proposed project components, an assessment of their likely environmental impacts as well as mitigation measures that is recommended to be used.